Winding Down

I received an email about needing the last 3 years of Tax Returns, plus the latest month's paystubs. It took a bit of creative footwork, as I didn't have a copy of 2017 at all and my 2018 wasn't a digital copy. In the end, it was all successfully uploaded/submitted today. My little coun…

Master Bedroom

During my downtime at work (overnight weekends) I've been steadily losing grip of reality thanks to Pinterest. I have a list going of prospective projects AND assorted power tools that I'll need to acquire.SIMPLE projects. Nothing elaborate. 
Like, straight cuts and simple measurements.

MASTE…

Wrapping Up

So here we are, a couple days shy of Mid-October and the current construction manager has communicated that he should be "signing-off" on everything by the end of the week to go forward with scheduling a closing date. 

There are only a few things remaining at the house [appliances to be delivered, hardware on cabinetry, sod in yard] but everything else is in place [carpets, toilets, light fixtures, water heater, A/C unit, trim, sinks/faucets, door handles, etc]. I've been trying to keep the Progress Pics Photo Gallery going as best I could.

Building a House: A Photo Gallery

I realized I needed a post specifically that included a running tally of all the photos, pretty much so I could bring it up and show friends at work. I think I will make this a pinned post so it stays on top.

Our gallery timeline begins with the formal processing of our Earnest Money + Construction Deposit and when it was officially reflected online. Our plot markers turned red on the same day, but LOT 27 beat us by 2 days. Unfortunately, their contract would fall through and ended up coming available as a Quick-Sale and has since resold. So........ by default, that makes us the first Homeowners in Phase D of our neighborhood!!

Here's a screenshot of when everything went live:

Red = Sold  ||  Green = Available  ||  Grey = Unreleased  ||  Blue = Quick-Sale.


Dining Room

As mentioned in my last post, in order to combat some of my latest stressors, I've fixated on a couple different items we will 100% need once we get in the house. We'll go ahead and cover the dining room options I've been investigating :)

I'm probably sinking too much energy into th…

Utility Options

I just wanted to compile a list I could keep ready and at-hand for when the time comes. Just know this list is for me to reference and build off of...




INTERNET:
Trying to secure Fiber Optic for our internet connection since we use it as our main source of.... well, everything.

What's available? …

House Meeting No.2

We had our second meeting with the Construction Manager today. We met at the house and did the Pre-Drywall Inspection. Its been right about a month from the last meeting and while its still been a "slow trickle" of progress, most of it is best visualized inside (the HVAC, the electrical running through the house, tubs/showers installed, cable pre-wiring, insulation markers, etc) so, it's not overwhelmingly different looking from the outside. With the exception of the freakin' DRIVEWAY! HELLO!